Skip to main content

Author: space4knews

Police Achieve Dominant Victory Over APF in PM Cup Cricket Tournament

News Summary

With Editorial Review.

  • Nepal Police Club secured a commanding 185-run victory over APF Club in the Prime Minister’s Cup Men’s National Cricket Tournament.
  • Chasing a target of 356 runs set by Police, APF was all out for 170 runs in 44 overs.
  • Police set the highest total in PM Cup history with 355 runs, breaking a record set by APF eight years ago.

March 23, Kathmandu – Nepal Police Club gained their first win in the Prime Minister’s Cup Men’s National Cricket Tournament by securing a one-sided victory against APF Club.

In the match held on Tuesday at Mulpani Ground, Nepal Police defeated APF by 185 runs. After Police set a target of 356 runs, APF was bowled out for 170 runs in 44 overs.

Nandan Yadav remained unbeaten with 44 runs, while Kamal Singh Airy scored 35. Sandeep Zora contributed 24 runs and Asif Sheikh scored 18 before being dismissed. Captain Rohit Paudel was out after scoring 11 runs.

For Police, Lalit Rajwanshi took 3 wickets for 28 runs in 10 overs. Karan KC, Rashid Khan, and Dinesh Kharel each claimed 2 wickets, and Sagar Dhakal took 1 wicket.

Earlier, after losing the toss, Police batted first and scored 355 runs for 9 wickets in their 50 overs, marking the highest team total in PM Cup history.

This record was previously held by APF, which had scored 339 runs against Madhesh Province in the 2018 PM Cup. Police surpassed this record after eight years.

Four Police batsmen made half-centuries against APF. Openers Dinesh Kharel and Shankar Rana, captain Arif Sheikh, and Dilsad Ali all scored fifties.

Shankar top-scored with 61 runs, Dinesh Kharel made 60, and captain Arif scored 50. Dilsad Ali remained unbeaten on 51. Rashid Khan contributed 44 runs.

For APF, Kamal Singh Airy and Amar Singh Routel each took 2 wickets, while Nandan Yadav, Rohit Paudel, and Yuvraj Khatri took 1 wicket each.

Previously, Police had lost their first match against Army, while APF defeated Bagmati Province.

झिमरुक–लुङ किनारका बस्ती अब सडक सञ्जालमा जोडिँदै – Online Khabar

Settlements Along Jimruk–Lung Banks to be Connected to Road Network

News Summary

Reviewed by Editorial.

  • The construction of three concrete bridges at Kitghat, Dobh, and Machhi–Pidalne on the banks of Jimruk and Lung rivers has entered its final phase.
  • The Kitghat Bridge, launched on Ashad 7, 2081 (June 21, 2024), has been completed ahead of schedule.
  • These bridges will connect residents of the Tushara Bensi area to the road network, facilitating daily life and emergency services.

March 24, Pyuthan. Settlements along the Jimruk and Lung rivers are set to be integrated into mainstream development.

With the three concrete bridges under construction at Kitghat (Kutichaur), Dobh, and Machhi–Pidalne reaching their final stages, a wait of nearly two decades is nearing its end.

The river was the greatest obstacle for these settlements located on the opposite side of the Bagdula–Machhi and Bagdula–Bahane roads. Although dirt roads reached these areas, the absence of bridges hindered vehicle movement. Now, with these bridges completed, these communities will be directly connected to the road network, easing daily life and emergency access.

The Kitghat Bridge, started on June 21, 2024 (Ashad 7, 2081), with a budget of NPR 47.8 million, has been finished ahead of the scheduled deadline.

The construction company, Ashu Construction Services, aims to complete the Machhi–Pidalne Bridge, costing NPR 72.6 million, within this month of Ashad.

These bridges will particularly provide relief to residents of the Tushara Bensi area. Until recently, people had to wait to see vehicles cross the river, but now the geographical and developmental gap is closing.

The Lumbini Provincial Government allocated roughly NPR 310 million (NPR 31 crore) in the fiscal year 2079/80 (2022/23), enabling the implementation of this long-delayed plan.

Driven by Provincial Assembly Member Nima Giri’s initiative, the project includes the construction of bridges at Kitghat, Pidalne, and Dobh.

Currently, the Kitghat Bridge is fully operational, while the Pidalne Bridge is 85 percent complete, and the Dobh Bridge is about 50 percent finished. Once the Dobh Bridge is complete, residents from Dobh to Piplatari will benefit directly, and the Bahane–Machhi road will be directly connected.

The bridges have reduced not only travel distance but also travel time and risk. The need to detour roughly 11 kilometers via Bagdula to reach Machhi and Tushara from Bahane will soon become a thing of the past. Risks associated with river crossing during monsoon months are expected to be eliminated as well.

According to former Vice-Chair of the National Planning Commission, Dr. Govindraj Pokhrel, although funding constraints caused delays, the plan had been conceptualized earlier.

“After the budget was secured, the project gained momentum,” he stated.

Meanwhile, NPR 350 million has been earmarked for the Bagdula–Machhi road and NPR 120 million for the Bagdula–Adheri road paving, with rapid progress underway. Provincial Minister Saroj Thapa has been monitoring the work and has directed that the projects be completed within the stipulated timeline.

These three bridges now represent gateways to opportunity for local communities—providing access to markets for agricultural products, hospitals for patients, schools for students, and emergency services directly at their doorsteps.

The project is expected to bring significant relief to the inhabitants of settlements along the Jimruk–Lung riverbanks.

87 New Tuberculosis Cases Detected in Baitadi Amid Testing Shortfalls


March 24, Baitadi – Over the past year, 87 new tuberculosis (TB) cases have been identified in Baitadi district. Among the newly diagnosed, 66 are males and 21 are females, according to Khagendra Singh Karki, Information Officer at the District Health Office, Baitadi.

The Health Office had set a target to test 538 individuals for tuberculosis in the current fiscal year. However, only 203 people have been tested so far, with 87 confirmed cases of TB among them.

“Not reaching the testing target poses a significant challenge,” said Teerth Raj Bhatt, the head of the Health Office. He added that the office is accelerating TB identification efforts through health camps across various locations in the district. Campaigns such as the ‘TB-Free Municipality Campaign’ are also being carried out in municipalities like Surnaya Rural Municipality and Purchaudi Municipality.

According to the World Health Organization, approximately 67,000 new tuberculosis cases are added annually across Nepal.

Man Found Dead in Sankhuwasabha

News Summary

Prepared by AI. Editorial review completed.

  • Debi Bhakta Damai, 60, was found dead in Sankhuwasabha.
  • He was a resident of Nun Dhaki, Tatopani, Ward No. 1, Chainpur Municipality.
  • The Central Police News Desk reported he was found deceased near the Tatopani Gate on Tuesday.
  • Further investigations into the incident are ongoing.

March 23, Kathmandu – A man has been found dead in Sankhuwasabha.

The Central Police News Desk informed that 60-year-old Debi Bhakta Damai, residing in Nun Dhaki, Tatopani, Ward No. 1, Chainpur Municipality, was found dead.

He was discovered in a deceased state near Tatopani Gate on Tuesday, according to the police.

Further investigation is underway regarding the incident.

Submit Justification Within 24 Hours If No Action Required, Urges National Sports Council

News Summary

Prepared after editorial review.

  • The National Sports Council (NSC) has written to the All Nepal Football Association (ANFA), requesting a written explanation within 24 hours if there is no reason to impose disciplinary action.
  • NSC has directed ANFA to provide clarification within 24 hours regarding the decision not to postpone the election.
  • NSC’s Member Secretary held discussions with ANFA’s President and General Secretary about the early elections, after which the Executive Committee requested a final clarification.

March 24, Kathmandu – The National Sports Council (NSC) has issued a letter to the All Nepal Football Association (ANFA) asking for a written explanation within 24 hours if there is no reason to take disciplinary action against it.

Saroj Kumar Pokharel, Head of the Sports Development Department at NSC, stated that despite repeated discussions and instructions, compliance has not been observed, prompting the letter demanding a justification within 24 hours.

“Given the repeated failure to comply with discussions and directives from the regulatory body, the Executive Committee of the Council decided in its meeting dated 2082/12/09 (Nepali calendar) that since Section 28(d) and Section 29(1) of the Act have been disregarded, and actions contrary to existing laws have been taken, the question arises why disciplinary action should not be taken according to Section 29(2) of the Act. Therefore, as per Section 7 of the Act, we request a written explanation with valid reasons within 24 hours of receipt of this letter,” the letter states.

Previously, NSC had informed ANFA on March 19 to provide written information within three days regarding the postponement of elections. However, on March 22, ANFA replied that the elections would not be postponed and they would be held as scheduled on March 27.

On Monday, NSC Member Secretary Ram Charitra Mehta convened discussions at NSC with ANFA President Pankaj Bikram Nembang, General Secretary Kiran Rai, and other stakeholders concerning the early election issue.

Following these discussions, the NSC Executive Committee meeting extended a final opportunity to ANFA to submit clarifications within 24 hours.

हुम्लामा गोठभित्र पसेर चितुवाले मार्‍यो ४५ भेडा – Online Khabar

Leopard Kills 45 Sheep After Entering a Pen in Humla


March 23, Humla – A leopard entered a sheep pen in Chankheli Rural Municipality-5 and killed 45 sheep. This incident took place in an area called Porigaun.

Jasbahadur Tamang, a local resident of Chankheli Rural Municipality-5, reported that the leopard attacked the sheep pen on Sunday night, killing 45 sheep.

Tamang stated that the sheep, owned by local resident Ratan Tamang, were brought from the forest to graze and kept inside the pen when the leopard launched its attack, resulting in the loss of all 45 sheep.

Stock Market Hits Highest Level in 8 Months; Six Companies Gain Over 10%

News Summary

Prepared after review.

  • On Tuesday, the NEPSE index reached 2960 points, the highest since Shrawan 13 (mid-July).
  • Out of all companies, 136 saw their share prices increase, 117 companies recorded declines, and 11 remained unchanged.
  • The trading sector led gains with a 9.12% rise, while Vishal Bazaar’s price increased by 9.91% contributing to the sector’s top growth.

10 Chaitra, Kathmandu – On Tuesday, the stock market’s NEPSE index hit its highest level in approximately eight months. The index rose by 23.83 points, closing at 2960 points, a level last seen on Shrawan 13. However, the trading volume declined slightly, dropping from NPR 1.578 billion on the previous day to NPR 1.483 billion.

Among the listed companies, 136 experienced a rise in share prices, while 117 saw declines, and 11 remained stable. The trading sector recorded the largest growth of 9.12%, with only two companies listed in this category. Notably, Vishal Bazaar’s share price surged by 9.91%, driving the trading sector’s substantial growth.

Other sector performances included banking, which increased by 0.67%, development banks by 1.38%, finance companies by 0.51%, hydropower by 1.32%, investment groups by 0.11%, and manufacturing and processing by 0.86%. Conversely, hotel and tourism dropped by 0.17%, life insurance by 0.37%, microfinance by 0.46%, non-life insurance by 0.38%, and trade by 0.16%.

Six companies posted gains of 10% or more. These companies include Reliance Spinning Mills, Salpa Development Bank, Solu Hydropower, Himalayan Power Partner, Bhujung Hydropower, and Hotel Forest Inn.

First Microfinance recorded the steepest decline, falling by 6.56%. Other notable declines included Manakamana Engineering Hydropower at 5.11% and Mero Microfinance at 4.53%. Among the most actively traded companies were Radi Hydropower, API Power, HIDCL Promoter, Ngadi Group, and Shivam Cement.

Construction Business Delay Leaves Harichaur–Malm–Pandavkhani Road Incomplete

News Summary

  • Although the contract for the Harichaur–Malm–Pandavkhani road construction was signed in Bhadra 2079 with a budget of 252 million NPR, only 70% of the work has been completed after three years.
  • Vishnu Lamichhane, Information Officer at the Road Division Office in Baglung, stated that the deadline was extended twice due to delays in completing the work on time.
  • Once upgraded by the Worldwide/Lopurna JV construction company, the road will directly connect Galkot Municipality, Badigad, and Nisikhola Rural Municipalities.

9 Chait, Galkot (Baglung) – Despite a contract to complete the Harichaur–Malm–Pandavkhani road within two years, the construction company has failed to finish the project even after three years.

This strategic road, part of an electoral area development plan, remains incomplete, disrupting the daily lives of the local community. The contract was finalized in Bhadra 2079 (August-September 2022).

According to the agreement, the project should have been handed over by Bhadra 2081 (August-September 2024). Although the deadline has been extended twice for the 8-kilometer road paving, only about 70% physical progress has been achieved so far.

Vishnu Lamichhane, Information Officer at the Road Division Office, Baglung, confirmed that due to the delay in work, a second extension for the deadline was granted.

The Worldwide/Lopurna JV Construction Company held the responsibility for the road construction. Locals even protested against the firm in Kartik 2080 (October-November 2023).

Payment issues initially affected the construction company’s willingness to proceed with the work. The contract was awarded in Bhadra 2079, with an allocated budget of 252 million NPR.

The project focuses on upgrading, concreting, and paving the 8-kilometer stretch from Harichaur to Malm. Upon completion, the road will provide direct and convenient connectivity between Galkot Municipality, Badigad Rural Municipality, and Nisikhola Rural Municipality.

Army, Times, and GoldenGate Maintain Dominance in the First Phase of Himalayan Java National Basketball League 2026

Summary: In the first phase of the Himalayan Java National Basketball League 2026, Tribhuvan Army Club, Times, and GoldenGate are showcasing exceptional performances. All three teams have accumulated 13 points each. Based on point differentials, Army holds first place, Times second, and GoldenGate third. The league, featuring 8 teams, will see the top four advance to the playoffs, with the winner receiving a cash prize of NPR 400,000.

Kathmandu, 10 Chaitra — Following the completion of the first phase of the Himalayan Java National Basketball League 2026 (HJNBL), departmental team Tribhuvan Army Club, defending champion Times, and GoldenGate have established their dominance. With all eight participating teams having played 7 matches each, these three teams share the top spot by securing 13 points apiece.

After the league was not held last year, the Army, who did not participate previously, qualified for HJNBL this time by winning the Linning Basketball Championship. Demonstrating an outstanding performance, Army has maintained the top position throughout the phase. Although Army, Times, and GoldenGate have equal points, the point differential places Army first, Times second, and GoldenGate third. Each of these teams has suffered only one loss.

Defending champions Times were defeated by GoldenGate in their opening game but then went on to win six consecutive matches. Army started strongly as well, having lost only once to Times. GoldenGate’s sole defeat came against Army. These three teams have beaten each other once during the phase but have secured wins against the other five teams in the league.

गगन थापा – Online Khabar

Gagan Thapa Emphasizes Focus on Convention to Unify the Party

News Summary

Prepared by AI. Editorial review completed.

  • Gagan Kumar Thapa, president of Nepali Congress, stressed that the entire party should focus on the upcoming convention.
  • Thapa expressed commitment to include everyone without bias in the convention participation.
  • He stated that he is leading the convention process and that it will continue without interruption.

March 23, Kathmandu – Gagan Kumar Thapa, president of the Nepali Congress, has urged the entire party cadre to now focus on the upcoming party convention.

Addressing the party’s central working committee meeting on Tuesday, he made clear that the convention journey is under his leadership and will not be halted.

He argued that there should be no biases regarding who participated or did not participate in the previous convention.

“A special convention was held under exceptional circumstances. That special convention elected new leadership. We participated in those elections. From now on, there will be no differences regarding who took part before or after that special convention,” said President Thapa.

He emphasized progressing forward with consensus and unity by ensuring equal participation in the convention.

“I have been leading this vehicle as president, and it will not stop now. Especially, there will be no bias regarding who participated in the special convention or not,” he added. “I have also requested the vice presidents and several leaders to move ahead by including everyone.”

11 Security Personnel of Pashupatinath Unit Awarded for Outstanding Performance

March 23, Kathmandu – Eleven armed police security personnel serving in the Pashupatinath unit have been recognized and awarded for their outstanding performance.

On the occasion of the 22nd establishment anniversary of the Armed Police Force, Inspector General of Police (IGP) Raju Aryal presented awards to these eleven personnel on Tuesday. The awardees have been officially recorded and honored.

Those awarded include SSP Netra Bahadur Karki, DSP Tar Bahadur KC, Inspector Madan Adhikari, Sub-Inspector Pawan Pandey, Assistant Sub-Inspector Bhakta Bahadur KC, Assistant Sub-Inspector Jhar Bahadur Chand, Senior Havildar Uttam Basnet, Havildar Navaraj Lamichhane, Havildar Basudev Lamichhane, Assistant Havildar Ram Lama, and Constable Kishan Kumar Singh.

School Building Construction Remains Incomplete Due to Budget Shortage

News Summary

Prepared by AI following editorial review.

  • The construction of Rambadevi Mata Basic School building in Limsing, Wahaki, Wihadi Rural Municipality-4, has remained incomplete for the past three years.
  • The building project was initiated with a budget allocation of NPR 3.6 million by the Ministry of Education, but work has stalled due to lack of funds.
  • With the building incomplete, 19 students are forced to study in a room covered with corrugated sheets, causing concern among parents.

March 24, Parbat. The construction of a basic school building in Wihadi Rural Municipality has been left unfinished for the last three years.

The eight-room permanent building of Rambadevi Mata Basic School, located in Limsing, Wahaki ward no. 4 of Wihadi Rural Municipality, remains incomplete due to financial constraints.

The Ministry of Education had allocated a budget of NPR 3.6 million under the Presidential Educational Reform Program to start the building construction. However, the work has been suspended due to the inability to secure additional funds.

The unfinished building has put students in a difficult situation. Currently, the school offers education up to grade four with 19 students enrolled, according to Principal Shivani Pun.

According to Principal Pun, the students are compelled to study in a room with a tin sheet roof and floor, which is far from ideal.

She added that the tin-covered classroom raises safety concerns for both parents and teachers, especially during storms and strong winds, as the sheets risk being blown away.

१८ दिनदेखि न्याय पर्खिरहेको इनिसाको शव, कहाँ पुग्यो अनुसन्धान ?

Investigation Status of Inisa’s Body Awaiting Justice for 18 Days

Summary of the Report

Editorial review completed.

  • The investigation into the rape and murder of 16-year-old Inisa is in its final phase, with plans to file charges against all four accused.
  • The Central Investigation Bureau (CIB) team has returned to Kathmandu after completing their probe, while the District Police Office in Surkhet awaits three laboratory reports.
  • The victim’s family has taken a firm stance refusing to cremate Inisa’s body until justice is served, as nationwide protests demanding justice continue.

March 23 (10 Chaitra), Surkhet – The investigation into the rape and murder of 16-year-old Inisa Bika remains unfinished. Inisa, who died on 23 Falgun, has been held in the morgue of Karnali Province Hospital for 18 days.

Her body has been waiting for justice for the past 18 days. The victim’s family refuses to proceed with the cremation unless justice is delivered for their daughter.

“Our daughter’s life is lost; what purpose would it serve to perform her last rites now? We have decided not to claim her body until the perpetrators are punished,” said Indra Bahadur Bika, Inisa’s father. “Delay in justice is equivalent to denial of justice. We urge for swift justice.”

Across the country, protests and pressure campaigns continue to demand justice for Inisa. The family remains dissatisfied as the full details have yet to be publicly disclosed even after 18 days.

With the delay in justice, Indra Bahadur, who works in Dubai, is nearing the end of his leave. “My holiday is over. I invested in going to Dubai for work, with good salary and benefits,” he said. “The cremation has not yet taken place here, yet they have begun summoning me there.”

Though his daughter is no longer alive, he must return abroad for his son and family’s support. However, he has started doubting whether his daughter will ever receive justice. “The police have not provided clear information about the case so far. It seems the incident is becoming mysterious,” he added.

Immediately following the incident, the victim’s family registered charges of murder and rape against all four accused, claiming it was a case of gang rape followed by murder. On 23 Falgun, police detained a 16-year-old boy on charges of rape at the crime scene. Based on his statement, three other individuals were also taken into custody for investigation.

CIB Completes Investigation and Returns

The Central Investigation Bureau (CIB) team that came to Surkhet for the probe into Inisa’s case has returned to Kathmandu.

DSP Mahonjang Budhathapa, information officer of Surkhet District Police Office, stated, “The CIB team completed their investigation and returned to Kathmandu on Sunday. We are in the final phase of the investigation and are awaiting two laboratory reports.”

Following nationwide protests demanding truth and justice for Inisa involving schools, students, and social organizations, the Surkhet Police requested additional support from CIB on 28 Falgun. From 29 Falgun, a specialized team led by a police inspector has been working on the investigation.

The District Police Office had already completed its first phase of investigation. Considering the severity of the case, they sought assistance from the CIB for the further probe. Meanwhile, the District Police Office has formed a separate team to work on the investigation concurrently.

In total, four teams from Nepal Police, including the CIB, have conducted investigations into this incident.

Current Status of Investigation

The investigation into the Inisa case is in its concluding stage. The CIB has submitted its report to the Surkhet Police.

According to DSP Budhathapa, the police have completed all investigative work except for three pending reports: toxicological, viscera, and bio-serological. The investigation will conclude once these reports are received. “The postmortem, CIB, and digital reports are already in. The forensic report is also expected soon,” he said.

The postmortem report indicates that Inisa died due to severe injuries to her sensitive organs resulting in excessive bleeding after forced sexual intercourse.

The youth arrested at the scene stated that he lost consciousness due to heavy bleeding during intercourse with Inisa. The other three accused claimed they were only there to assist.

The police have confirmed that the statements of the youth and details from security camera timings and call records align with each other.

Charges to be Filed Against All Four Accused

Authorities are preparing to file charges against all four accused in connection with Inisa’s case. Statements and forensic test reports of all detained individuals are ready for submission to the government attorney’s office.

“We have completed 99 percent of the investigation. In the next day or two, all reports will be sent to the government attorney,” said an officer involved in the investigation.

The 16-year-old boy detained was reportedly in a consensual relationship with Inisa for some time and had gone to the forest near Shaheed Park on the morning of 23 Falgun.

According to his statement, the sexual contact was consensual until he suddenly lost consciousness due to Inisa’s heavy bleeding. “When Inisa stopped responding, I became frightened and called my friends,” he said.

The other three youths reportedly arrived only to provide assistance. Based on statements and CCTV footage, the timeline matches according to police, though their involvement remains unconfirmed.

The police also stated that charges will be filed against the three as well for failure to report the incident to authorities promptly.

Marriage and Self-Reflection

In the 2050s B.S., we entered into the bond of marriage. Our marriage was founded on inter-caste love. Both of us were teenagers then but were conscious of social status, family structure, and dignity. Even at that time, we felt that nothing could hinder love, and we still firmly believe that our decision was right. We remain steadfast and satisfied with our relationship. Looking back, we might have been immature in age, but we possessed the necessary understanding regarding responsibility, affection, and morality.

A few years after marriage, our daughter was born, followed by our son after six years. Under the joint guardianship of grandparents, great-grandparents, and uncles, our children were raised. After our daughter passed the SLC examination, she began her 11th-grade studies at a school hostel in Kathmandu. Time passed, and both children completed their education. Our daughter graduated with a bachelor’s degree. We are proud that our children have grown up to be humble, ethical, and practical, steering clear of any wrongdoing. We consider ourselves fortunate for this.

During our daughter’s postgraduate studies, one day she approached me and said, “Mom, I need to talk to you about something.” Initially, I was a bit worried, and many questions arose in my mind. After a brief pause, she revealed that she was in a romantic relationship. Then a stream of questions flooded my mind—Who is the boy? What kind of person is he? What is his family like? We began considering how to manage the situation in the days ahead. It took some time to convince my husband, but eventually, he trusted her. Our daughter introduced the boy she liked during her graduation ceremony. At that moment, her father was surprised by this unexpected meeting. He is typically a quiet, studious man who maintains close relationships only with select people.

It did not take long for him to accept our daughter’s relationship. Although she was of marriageable age, she still seemed young to us. We considered ourselves mature but did not see her as ready for marriage. At the time, we only viewed the truth as a dream. During the last Dashain festival, the boy’s family came to formally request our daughter’s hand in marriage, and negotiations began. On the 28th of Falgun, the daughter’s wedding was successfully held. She left happily, and we felt that we had fulfilled our duty successfully.

Many lessons in life are learned more through experience than from books. The meaning of true friends and relatives is also understood this way. Some relatives are not truly relatives, while some can be more affectionate, helpful, and respectful than others. These reflections compel us to appreciate genuine and intimate relationships fully and to savor the sweetness of life—nothing can stop you from doing that.

(The author, Pooja Khadka, is a teacher at Gorkha Model Secondary School, Lamahi-6, Dang.)

Trained Dogs Deployed for Security Operations in Chitwan National Park

File photo


Summary

  • Chitwan National Park has strengthened its security system by integrating technology with regular patrols, sweeps, and ambushes.
  • The park administration employs four trained dogs, drones, CCTV, vehicle tracking, and real-time monitoring technologies.
  • The use of technology has resulted in successful control of wildlife poachers and the arrest of offenders involved in related crimes.

Chitwan, March 23 – Chitwan National Park has started utilizing advanced technology to reinforce its security measures. Alongside regular patrols, sweeps, and ambush operations, technological tools are now being integrated into security efforts.

According to the park’s Information Officer Avinas Thapamagar, the administration conducts regular patrols over long, medium, and short distances, intelligence operations, and joint investigation cells.

Currently, the park has deployed four trained dogs specifically for security purposes. Additionally, it uses real-time monitoring systems, CCTV cameras, drones, and vehicle tracking systems to enhance protection of the park.

Patrols are conducted using various methods including foot patrols, bicycles, elephants, boats, and motor vehicles.

The officer noted that the use of technology has achieved significant success in controlling wildlife poaching activities.

He stated, “The application of technology has helped us apprehend individuals involved in crimes related to wildlife and effectively reduce poaching.”

This approach has also aided in controlling individuals moving around the park carrying prohibited wildlife items. Mr. Thapamagar emphasized that the use of technology in wildlife conservation is complemented by strong collaboration with partner organizations.

He further highlighted that the combined efforts of the Youth Mobilization Committee at the local level, the Nepalese Army, and the park staff have been crucial to successfully reducing poaching activities.